Manufacturing Facility Offices
A Comprehensive Office Renovation with a Critical Schedule
Yoe was hired by a major Central PA manufacturing client to renovate newly acquired office space in Red Lion, PA.
Challenge
As the building was abandoned, the offices inside were deteriorated and damaged necessitating full demolition of the existing spaces to tackle the job. The client’s critical move-in date required a tight schedule for final delivery.
Services & Solutions
To accomplish the 11,000-square-foot office renovation project by the client’s expedited move-in date, Yoe’s team built a meticulous plan of execution to determine the schedule, factoring in key phasing and project progression points to deliver the finished space on time and on budget.
Because of the condition of the existing space, a full demolition was necessary to begin the transformation into new office areas, restrooms, kitchenette, and conference rooms. All the renovations on this turnkey office fit-out were interior and included the complete redo of the HVAC, plumbing, and electrical systems. Yoe leveraged their own internal team as well as their trusted network of subcontractor partners to bring the right expertise to the job, delivering a seamless client experience and the peace of mind that comes from a single point of responsibility.
Results
With careful up-front planning and clear, constant communication with all parties from start to finish, Yoe’s team was able to navigate an efficient path to completing renovations on this expanded office space for a large regional manufacturer. The team rose to the challenge of a tight timeline and delivered the final product on time and on budget, delivering maximum value to a satisfied client.